Federal solicitation · 89503226BWA000078 · back to recent
North Gunnison Substation 115kV Switch Installation
- Agency
- ENERGY, DEPARTMENT OF
- Status
- Open
- Response deadline
- Not posted
- Posted
- July 31, 2026
- Set-aside
- Not listed
- NAICS
- 237130
- Estimated value
- $0.2M (as posted)
- Source
- View on SAM.gov
- Last checked
- 2026-08-14
Solicitation description
North Gunnison 115-kV Switch Installation to add a 115kV Disconnect Switch to the bus work to provide flexible operation to feed the North Gunnison loads and allow WAPA to maintain all the electrical substation equipment. a. Provide demolition and site development. b. Remove and dispose of existing pedestals, rigid bus, insulators, and concrete foundations. c. Furnish and install 115kV disconnect switch, structural steel, foundations, and associated equipment.
Similar opportunities
Other open SAM.gov opportunities under the same NAICS, prioritizing the same buying agency.
| Title | Agency | Est. value | Basis |
|---|---|---|---|
| Denison Substation Stage 10, Iowa | ENERGY, DEPARTMENT OF | $9.4M | same agency naics |
| Carpenter Substation Stage 03 South Dakota | ENERGY, DEPARTMENT OF | $3.4M | same agency naics |
| ADOT SR303 EXTENSION PROJECT | ENERGY, DEPARTMENT OF | $2.7M | same agency naics |
| Weld Substation Stage 05 | ENERGY, DEPARTMENT OF | $2.3M | same agency naics |
| Beresford Substation Stage 11, South Dakota | ENERGY, DEPARTMENT OF | $1.9M | same agency naics |
| Gavins Point-Yankton Junction 115 kV TLine Rebuild | ENERGY, DEPARTMENT OF | $1.9M | same agency naics |
| Cottonwood Substation Construction, Stage 02, Phas | ENERGY, DEPARTMENT OF | $1.3M | same agency naics |
| Sidney Substation Breaker Replacement | ENERGY, DEPARTMENT OF | $0.6M | same agency naics |
Data this profile does not cover
- No likely incumbent surfaced; the solicitation number did not match any award record in the trailing window.
- No award records for NAICS 237130 in the trailing 12 months, so the vendor field is unavailable.